Tag: rewiring

  • Setbacks in Rewiring Our 1891 Victorian House

    Setbacks in Rewiring Our 1891 Victorian House

    More progress has been made in the rewiring of our Victorian, but it has not been going well.

    The problems all started when we lost power to the second floor in October, 2014. The electrical system was unsafe and we quickly had the problem repaired, but we discovered active knob and tube in dangerous condition throughout the house. Here’s what I wrote in an update from July of the next year.

    “The light above the stove sparked and burned a light bulb in Brandon’s hand as he was changing it out one day, which was more than a little scary. In an unrelated event (I think), we mysteriously lost power to a portion of the second floor. While our electricians were fixing that problem, they found active knob and tube that was missed during our initial house inspection, and thus began the rewiring of the entire place. The bulk of the job is done now, but it was suggested that we wait to finish the rest when we didn’t have a newborn. We agreed and then we were waiting until after we hosted my sister’s bridal shower in the house (which I will share next week), and now we’ll be able to get back to it as soon as we can get back on the electricians’ schedule. A ceiling is coming down, walls are being opened, and the house is going to be in a state of chaos for a while, but I’m looking forward to getting this work done because it has been holding other projects back.”

    Work resumed in November, 2015. When we tried to have our electrician back out to continue rewiring the house, we found out he had “left the company,” and we suspect that he may have been fired. We came to realize, after having a new team of electricians out, that we may have gotten screwed because at that point we had spent a lot of money and thought a lot more work had been completed. It’s a sick-to-your-stomach feeling, and I don’t feel great about putting this out there, but that’s the truth of what happened. Turns out “the bulk of the job” having been completed was pretty inaccurate.

    The third floor, being farthest from the basement where the electric panels are, is the most difficult part of the house to rewire. The plan was to start there, working down floor by floor, until the whole house had been done. When we paused work the first time (because I was about to give birth and caring for a newborn is hard enough without having workers tearing apart your house everyday), the third floor was supposedly done. The whole house was supposedly 80% finished, which didn’t really sound right since they had only been doing the top level, but OK. Maybe because they had fished new lines up, it would all be easier to go from there? Yeah, no. Turns out the whole level was still on one circuit, meaning that a big portion of the work that we thought had been done had not. WTF.

    Even the repairs attempted by that first guy’s team were done poorly. It sounded great, in theory, that one company could handle rewiring the house and fixing things up again after they were done, but after seeing what they did, we told them to stop. They’re electricians, we reasoned. Let’s not judge based on their ability to fix a wall.

    Damage After Rewiring, Third Floor

    You see why we told them to stop “fixing” the holes? We would do it ourselves, or hire somebody who knew what they were doing (and likely at a lower hourly rate).

    Damage After Rewiring, Third Floor

    Damage After Rewiring, Baseboard, Third Floor

    There was also a new scuttle hole made in the hallway ceiling. They were super proud of the way it turned out.

    New Scuttle Hole for Rewiring, Attic, Unfinished

    Bad repairs, the work wasn’t done properly, and so much money was wasted. Brandon is angry about the whole situation; I’m just sad. I love this house, but it is not making it easy on us.

    A new team of electricians started in November. They split the third floor up into different circuits, fixing problems along the way, and they rewired the second floor. They found a chase that runs all the way down to the basement, which they used to run new lines up. We had thought that the ceiling in the hallway would have to come down, but instead they ran conduit along the surface and we will have to drop a new drywall ceiling below, keeping as much of the height as we can. Our hallway looks like this right now.

    Hallway Ceiling, Second Floor, with Conduit for Electrical Rewiring

    Hallway Ceiling, Second Floor, with Conduit for Electrical Rewiring

    It looked like this when we remodeled the second floor before Calvin was born, so we’re kind of used to this sort of thing by now, but still. It was finished and nice for a little while.

    Second Floor Hallway being Remodeled

    The cheap toggles for the hall lights will be switched out for the reproduction push-button switches we’ve installed elsewhere throughout the house, but they’re a little finicky, so we’ll put them up after the mess of drywalling, patching, sanding, and painting has been finished. The hallway will get sconces, too! It’s all going to look very nice, if you can see past its current condition.

    Light Switches

    Portions of the house did have newer wiring and therefore escaped with minimal damage, but nearly every room on the second and third floor is in need of at least a little repair. This is the wall in one of the bedrooms, on the other side of those light switches.

    A Hole in the Wall

    The house is still not completely rewired. The second and third floors are done though, as are the outlets on the first floor that were easily accessible from the basement. All of the ceiling fixtures and wall switches on the first floor still need to be done. Our potential kitchen renovation is off the table for now and we’re thinking that we shouldn’t even worry about rewiring it yet because there’s going to be a lot of damage (in a room with wallpaper, beadboard, and a tin ceiling) and it’s going to be expensive. It may be best to finish everything else and apply the money we would spend in the kitchen on a full gut reno, opening up the walls to reconfigure the layout and addressing the wiring then.

    We are pausing the electrical work a second time because our finances need time to rebound a bit while we fix the walls and ceilings upstairs. A new ceiling along the entire second floor hallway won’t be cheap, but it will be a lot easier to knock out than the rewiring has been. It all needs to be done sooner rather than later, but the old wiring has been in place for decades and it can sit tight for just a little longer. Up next for us is the One Room Challenge, which I am ridiculously excited about because I need something back in order. I need a break to just concentrate on making something pretty! The closet/dressing room was a nice project — one that I thought was done. And then it turns out that there was an old line feeding the light fixture. Four new holes were made.

    Holes in the Closet's Plaster Walls

    Oh, and this person-sized hole on the third floor to access the closet’s ceiling fixture from above. Fun times.

    A Person-Sized Hole in the Attic Playroom Wall

    Two floors down. Sort of. One to go.

  • Closet Plans and Layout

    Closet Plans and Layout

    Being surrounded by all of your clothes as you drift off to a peaceful slumber really kicks up that urge to pare down, especially with the whole New Year thing.

    It has been a couple of months since the closet’s contents took over the bedroom as we emptied the space to work on it. The carpet has already been ripped up, the terrible subfloor repaired, and new solid oak flooring put down. I’ve also removed the old sheet mirror from the sink nook and have made progress on those crumbling plaster corners. (They’re so much better! I scrapped the corner trowel and just did one side at a time. Far easier technique.) One spot needs a touch more work, but I’ll wait to mix up another batch of mud. There are new holes to come, hopefully as soon as this week, when new wires will be fished through.

    Repairing Plaster Corners

    One of the electricians was working on pulling a whip from the closet today, and she lowered the ceiling fixture to get a better look at the wiring in there. The house is 125 years old and it has been updated in bits and pieces over the years, so some areas are all right but the closet doesn’t look like one of them. Paper covered wires (plus a few modern wires spliced in, temporarily).

    Old Paper-Wrapped Wires

    This, by the way, is the only type of wiring I’m ever confronted with when changing a light fixture. What a crazy day it will be when I go to put up a new light and the colored wires will match what the instructions tell me to do!

    Once the rewiring is done in there, I can get in patch the new holes that are being made. Since the ceiling needs to be accessed anyway, I’m taking the opportunity to move the light over about six inches and center it. More patching will of course mean more sanding, which means more fine white dust everywhere, but then it will finally be time to wipe down the walls, prime, and paint. The walls and ceiling will both need it.

    Here’s where we’re at.

    • Empty the closet

    • Remove wall-to-wall carpet

    • Rip up old wood floor

    • Repair the subfloor

    • Install new hardwood flooring (to match the original)

    • Remove sheet mirror

    • Patch the plaster wall and corners behind the mirror

    • Rewire (sconce, ceiling fixture, two switches, two outlets)

    • Patch holes and damage from rewiring

    • Paint prep (mostly cleaning all of the plaster dust everywhere)

    • Prime (walls and ceiling)

    • Finalize design plan

    • Repair or replace garment rack (I fixed it!)

    • Research and order new closet fittings

    • Paint (walls and ceiling)

    • Rewire antique lights or choose replacements

    • Rehang lights

    • New mirror above the sink

    • Add storage near the sink

    • Install new closet fittings

    • Zhush it all up a little

    • Put everything away (paring down in the process)

    Is that everything? I think it is.

    I worked with the 3D rendering I’d made again, playing around with the best way to organize our closet. There’s only one long, straight wall that makes sense for most of the clothes, but I thought that a mix of double hanging (what we had) and shelves would be more useful. And if we could get our floor length mirror in a different spot, it would free up space on the only other straight wall for additional storage. The Sarah Storage collection looked like a perfect fit so I reached out to Ballard Designs and they’ve sent a few pieces over. They’ve already arrived and I’m pretty excited about them, but they’re hanging out on the first floor until the closet is far enough along to bring everything up.

    Such a funny layout, but it’s going to be so great when it’s all put back together again!

    Closet Layout 1

    Closet Layout 2Closet Layout 3

    Closet Layout 4

    Closet Layout 5Closet Layout 6

  • The Big, Not Fun Project!

    The Big, Not Fun Project!

    I’ve been clearing things out around the house in preparation for some work that’s going to be happening on the first and second floors. Dun-dun-dun (scary movie music cue)… REWIRING.

    This stupid rewiring project. It is expensive, messy work, and because we paused after getting to a stopping point on the third floor, it feels like it has taken forever. It has held up tons of other things I’d rather be focusing (and spending money) on. So we’re ripping things out now, the electricians will come in and do their thing – around the holidays, which I can only assume will make this a speedy, uninterrupted process – and then we’ll have to patch and repair and fix and paint and blah, blah, blah.

    This is our past, but also, our future. (Whoa, deep.)

    Hallway Renovation

    The walls won’t be completely opened up, so at least there’s that? Here’s the work to be done…

    The Second Floor Hallway
    Goodbye, unblemished ceiling. See ya, floor. Hello, studs and subfloor.

    We opened and reconfigured the hallway while remodeling last year (photo above) turning the house’s second kitchen into a bedroom/nursery, and we replaced a portion of the flooring when we did that. We had planned to continue down the length of the hall anyway, so we’re timing it to coincide with the home’s rewiring so that hopefully it will lesson the damage to the ceiling on the first floor. The hallway ceiling is either getting Swiss-cheesed or taken out completely in hopes that most of the wires can be fished through for the bedrooms. There are probably still going to be plenty of holes in every single room. But maybe less so?

    The Closet
    Since we’re already ripping up the floor in the hallway, I figured hey you know what’s fun? Emptying the entire contents of the bedroom closet you and your husband share, pulling up the carpet, fixing the subfloor, and laying hardwood. I mean, let’s make the house feel as chaotic as possible by taking over the room where you sleep! (There’s a pretty noticeable soft spot in the closet floor that is getting worse, just inside the doorway. ADD IT TO THE LIST.)

    The Dining Room
    The huge pendant light is centered on the room, not on the table. Guess which I’d prefer? The beam (hollow, not original) is probably going to have to come down for access to the junction box, so this seems like a good time to reposition the light. Thinking about adding a couple of sconces in there, maybe. Flanking the windows.

    The Double Parlor
    The electricians are going to be taking down the light fixtures when they do their work. It would be nice to have something different to replace the matching lights in both rooms rather than putting the same ones back up. I want to add a couple of sconces to the bookshelves, too.

    Actually… Lots of Rooms
    I should probably have some new light fixtures ready to go for other rooms. Ceiling fans in some bedrooms for sure. Rewire/replace the broken kitchen pendants? Entryway? I’ve been looking at tons of options, trying to come up with a cohesive plan, and pinning, pinning, pinning all along the way.

    And the Kitchen
    Ooh, boy. The electricians don’t even want to touch the kitchen because they’ll open the walls, damaging the wallpaper, and they need to get up behind the tin ceiling. “Leave it until you renovate it,” they told us. Sounds great in theory, but renovating that kitchen is going to be expensive to really do it right, and I won’t know how much we can afford to do in there until the work in the rest of the house is closer to completion. The wiring is old and crazy in the kitchen and it needs to be addressed at some point, but do we just open all the walls at once and go for it, or approach it more sensitively, trying to minimize damage and keep the existing ceiling/cabinetry/everything intact? Fun stuff.

    FUN STUFF.